Sunday August 09, 2009 16:17
 

Home Contact us |Download
 

 
 
 
 

 

 

 
 



 

Human Resource

Engineering works

Fabrication & Assembly

Installation&Commissioning




KTC Assets

Fabrication and Assembly Works

Kerman Tablo Manufacture Work space
The KTC Factory is located in 1st Km of Zarand, road Kerman City on a 10,000 square meters land with about 8,500 Square meters covered area.
The manufacturing area is divided to 4 sections as below:

1-Metal Workshop and Painting
2-Panel assembly and Electrical Test area and Warehouse
3-Electronic Assembling Line
4-Electronic Test Lab
Following table shows each work space area of different sections in factory


Kerman Tablo Manufacturing Equipment

1. Mechanical workshop equipment
Following table shortly illustrates the equipment and facilities of mechanical workshop.

2. Panel Assembling workshop equipment

3. Electronic Assembling workshop equipment

4. Testing Workshop

 

 

 

 

 

 














 










 

 

Username:

Password:

 

   
 
  About us | Our family | Our References |  Our Solution | KTC Assets | Join us |  News

© 2009 KERMAN TABLO CORP. All rights reserved