Our References
Control system (DCS, ESD, F&G, PMS)
ESD and SCS of IGAT III
Gas Turbo compressor stations
Client:
National Iranian Gas Company NIGC
Consultants:
EIED
Location:
Pataveh ,Farashband and Kangan Gas
Compressor Station
General Contractor:
OIEC
I & C Contractor:
KTC
Status:
Final Acceptance
Objectives:
Emergency shutdown system (ESD) and
supervisory control system (SCS) and MIMIC.
KTC scope of work:
Emergency shutdown system (ESD) and
supervisory control system (SCS) and MIMIC.
Extension of Shahid Abbaspour (Karun 1)
Hydro Power Plant Project
Client:
Khouzestan Water and Power Authority
(KWPA).
Consultants:
Moshanir & Lahmeyer
Location:
Khouzestan-Iran.
General Contractor:
FARAB (affiliated to Iranian Ministry
of Energy).
C&I Contractor:
ABB AG.
KTC:
Sub-Supplier to ABB AG.
Status:
provisional hand-over
Objectives:
Engineering, supply, manufacturing
and supervision on erection and commissioning of the
computerized and conventional control system of new
Hydro power plant.
Plant characteristics:
Four (4) Generating units, 250MW
each, one (1) Diesel Generator, Hydro mechanical
and Auxiliary systems, 400kV Switchyard.
KTC scope of work:
- Engineering, supply and
manufacturing of conventional and computerized
control cubicles.
- Co-operation with ABB in Basic and Detailed
engineering of Distributed Control system
software.
- Supervision on erection and commissioning of the
control system.
KARUN 3
Hydro Power
Plant Project
Client:
Iran Water and Power Resources Development Company (IWPC)
Consultants:
Mahab & Acres
Location:
Khouzestan-Iran.
General Contractor:
FARAB (Affiliated to Iranian Ministry of Energy).
C&I Contractor:
ABB AG.
KTC:
Sub-Supplier to ABB AG.
Status:
provisional hand-over
Objectives:
Engineering, supply, manufacturing
and supervision on erection and commissioning of the
computerized and conventional control system of new
Hydro power plant.
Plant characteristics:
Eight (8) Generating units, 250MW
each, two (2) Diesel Generator, Hydro mechanical and
Auxiliary systems, 400kV Switchyard.
KTC scope of work:
- Engineering, supply and
manufacturing of conventional and computerized
control cubicles.
- Co-operation with ABB in Basic and Detailed
engineering of Distributed Control system software.
- Supervision on erection and commissioning of the
control system.
Masjed-e-Soleiman
Hydro Power
Plant Project
Client:
Iran Water and Power Resources Development Company
(IWPC)
Consultants:
Moshanir & Lahmeyer
Location:
Khouzestan- Iran.
General Contractor:
FARAB (affiliated to Iranian Ministry of Energy).
C&I
Contractor:
ABB AG.
KTC:
Sub-Supplier to ABB AG.
Status:
Final Acceptance Certificate
Objectives:
Engineering, supply, manufacturing
and supervision on erection and commissioning of the
computerized and conventional control system of new
Hydro power plant.
Plant characteristics:
Four (4) Generating units, 250MW
each, one (1) Hydro station service Turbine-
Generator, Hydro mechanical and Auxiliary
systems,400kV Switchyard.
KTC scope of work
-Engineering, supply and
manufacturing of conventional and computerized
control cubicles.
- Co-operation with ABB in Basic and Detailed engineering of
Distributed Control system software.
- Supervision on erection and commissioning of the
control system.
Extension of Masjed-e-Soleiman
Hydro Power Plant Project
Client:
Iran Water and Power Resources Development Company
(IWPC)
Consultants:
Moshanir
Location:
Khouzestan- Iran.
General Contractor:
FARAB (affiliated to Iranian Ministry of Energy).
C&I
Contractor:
KTC.
Status:
in operation
Objectives:
Engineering, supply, manufacturing
and supervision on erection and commissioning of
the computerized and conventional control system of
new Hydro power plant.
Plant characteristics :
Four (4) Generating units, 250MW
each, one (1) Hydro station service Turbine-
Generator, Hydro mechanical and Auxiliary
systems,400kV Switchyard.
KTC scope of work
-
Engineering, supply and manufacturing
of conventional and computerized control
cubicles.
- Supervision on erection and commissioning of the
control system.
- AC/DC, Auxiliary MCC panels
....