Automation Division is responsible for execution of industrial process automation projects, and has successfully carried out over 60 projects in various industries such as hydro electric power plant (HEPP), gas compressor station, pump stations, copper, cement, refractory bricks, plaster, asphalt, lime stone, sugar, salt and food processing industries.
Our powerful knowlege of hardware system based on VME-Bus standards or CAN field bus, user friendly DCS system for configuration of any industrial application and easy to use IEC 61131-3 languages for programming controllers has empowered us to be the pioneer in process automation system in Iran.
The following projects has been implemented with KTC`s, Persia-A system.
• Gas turbo compressor stations for Kangan, Pataveh and Farrashband (2004)
• Karkheh 3*133 mw HEPP (2003)
• Marun HEPP (2004)
• Moghan HEPP (2003)
• Imam Khomeini Airport pump station (2004)
• Abadan-Khoramshahr pump station (2003)
• Glass bending & tempering furnace system (2002)
• Dezful water distribution system (1995)
• Lavarak HEPP (2006-2007)
• Control system & PMS for Safashahr gas turbo compressor station (2006)
• Four gas turbo compressor stations for Azerbaijan pipeline (2006)
• PMS for Marand & Maraganlar gas turbo compressor station (2006)
• PMS for three gas compressor stations on IGAT V (2007)
Our outstanding experiences enabled us to use different controllers such as ABB, Siemens, Allenbradly, Hartmann, Braun, Pilz, etc. in various projects such as:
• Karun 3(8*250 mw) HEPP with ABB Advant controller 450 and 110 (2003 start)
• Karun 1(4*250 mw) HEPP with ABB Advant controller 450 and 110 (2004)
• Masjed-E-Soleyman (4*250 mw) HEPP with ABB Advant controller 450 and 110 (2003)
• Concentrate strong with Siemens S7 system (2003)
•  Khatoon abad copper smelter plant with Allenbradly, Hartmann Braun and Siemens S7 systems (2004)
• ESD system for gas turbo compressor stations with Pilz system “IGAT III” (2004)
• Masjed-E-Soleyman Extention (4*250mw) HEPP with “ABB industrial” controller 450 & 110 (2007)
• Four gas turbo compressor station, for “IGAT V” with Yokogawa centum CS 3000 (2007)
• ESD system for gas turbo compressor stations with Hima system for “IGAT V”.

 
 

 

 







 

 

 

 